You know who’s responsible.
Work with Oleg and a hands-on team. We keep the conversation open as your project takes shape.

Our Edmonds projects show real kitchen and bathroom work. Use the before-and-after views to discuss what to keep, what to improve, and where to focus your investment.
EDMONDS · HOME RENOVATION CONTEXT
Edmonds developed from George Brackett's homestead and logging activity, incorporated in 1890 and gained a railroad connection the following year. The original townsite remains part of downtown and its neighboring residential streets, while later housing extends across the city's slopes. For an existing-home renovation, changes in level and the relationship between rooms can matter as much as the finish palette. Study the actual entrance, kitchen and living spaces together, keeping useful views and daily routes in the discussion without assuming that every Edmonds property has the same setting.
Local history source: About Edmonds ↗
HOME REMODELING · EDMONDS, WA
Put the rooms, layout changes, and finish choices into the same conversation. A written scope makes it easier to decide where the investment will help most.
APPROXIMATE COSTS · EDMONDS, WA
$20,000–$50,000
A broad starting range for planning. Full renovations with high-end appliances, custom cabinetry, and luxury materials can reach $75,000 or more.
$10,000–$25,000
A broad starting range for planning. Luxury finishes and custom work can take a high-end bathroom beyond $50,000.
Planning estimates, not a property-specific quote. Size, selections, layout changes, trade work, and existing conditions affect the final cost. Confirm allowances, appliances, permit fees, and tax in your written proposal.
Discuss your remodel ↗Measure steps, floor changes and door clearances before extending flooring or opening a kitchen. Show the intended connections on the plan rather than resolving them after materials arrive.
Describe interior changes, exterior openings and any structural work distinctly when reviewing Edmonds requirements. A finish replacement and a larger alteration should not be assumed to follow the same path.
Look at how cabinetry, partitions and lighting affect the adjoining living areas. A new arrangement should support everyday tasks as well as the view shown in a design photograph.
Record the rooms and finishes that will remain, then show how the Edmonds renovation meets them. Include transition details, selection responsibilities and the change process in the written scope.
Can the new rooms still feel like the same house? Keep a short list of existing elements you value, such as flooring, trim, or a view between rooms. Use that list when comparing new materials and transitions.
Explore our Edmonds project ↗YOUR HOME PROJECT, STEP BY STEP
Bring the rooms, current frustrations, inspiration, and existing plans. Discuss what you would like to keep.
Review layouts, selections, budget priorities, and design responsibilities before committing to construction.
Discuss access, usable rooms, material decisions, applicable permits, and the sequence of work.
Walk through the work, discuss remaining details, and keep the proposal and warranty information.
PLANNING IN EDMONDS, WA
Edmonds directs permit applications through MyBuildingPermit. Use the City’s permit assistance and forms to check the submittal requirements for the work you are planning.
Use the authority’s current guidance for the address and proposed work.
Edmonds permit assistance ↗Describe all affected rooms and distinguish interior work from structural changes, additions, and site work.
Share existing plans if you have them. Confirm the required approvals and design responsibilities before construction.
QUESTIONS BEFORE YOU BEGIN
Talk with Oleg & Sons Bellevue Home Remodeling about the rooms you want to change in Edmonds. Owner operated since 2013.
Check Availability ↗Record the levels, steps, floor build-ups and door clearances across the affected rooms. Include the intended transition between retained and new finishes. Where changing a level or opening affects structure, have the appropriate professional determine the required design and review.
Oleg & Sons Bellevue Home Remodeling lists an approximate kitchen remodeling range of $20,000–$50,000. A full renovation with high-end appliances, custom cabinetry, and luxury materials can cost $75,000 or more. Oleg & Sons Bellevue Home Remodeling lists an approximate bathroom remodeling range of $10,000–$25,000. High-end work with luxury finishes and custom details can exceed $50,000. These are broad planning estimates, not a quote for a particular property. The final proposal depends on room size, selections, layout changes, trade work, and existing conditions. Confirm allowances, appliances, permit fees, and tax in the written scope. Start with a defined list of rooms and changes, then review finishes, systems, and existing conditions. The size of the house alone does not describe the work. Discuss priorities, exclusions, and how proposed changes will be handled.
Edmonds directs permit applications through MyBuildingPermit. Use the City’s permit assistance and forms to check the submittal requirements for the work you are planning. Identify structural changes, new openings, affected fixtures and any addition or site work separately. Confirm the required documents and approval responsibilities for the actual address.
Yes. Follow the Edmonds project link on this page to explore our portfolio. The comparison gallery also includes work from other communities, with the actual project city shown beside each example.
That depends on access, the work areas, and which kitchen or bathroom facilities remain usable. Discuss protection, temporary arrangements, and the sequence before deciding whether staying in the home makes sense.
Oleg & Sons Bellevue Home Remodeling provides a 2-Year Workmanship Warranty. Ask about the written coverage for your project when reviewing the proposal.
Make a measured list of the rooms, features and materials that still serve the household. Compare repair, adaptation and replacement before demolition. For this Edmonds plan, plan transitions as finished details is a useful starting point, supported by the actual building records and appropriate professional assessment.
Create a selection and ordering plan that links cabinets, appliances, tile, fixtures, and flooring to the installation sequence. Agree who orders, receives, inspects, and stores each item. Check dimensions and delivery timing before committing to demolition, and document substitutions. Resolving shared decisions early helps avoid reopening completed work.
Use a written change process that explains the reason, revised scope, added or credited price, and schedule effect before approval. Ask for photos when concealed conditions are found, and separate necessary repairs from optional upgrades. Keep approved drawings and selections available so the original scope and later requests remain clear.
Discuss the deposit, material payments, progress milestones, and final completion requirements in the written contract. Ask what work or delivery supports each payment and how change orders will be billed. Avoid paying the entire project price upfront. Review progress against the agreed scope and keep written records of payments and approvals.
Find us on
PinterestTikTokLinkedInYelpHouzz