Dover White Slim Shaker
Slim Shaker

OLEG & SONS · DESIGN | BUILD | REMODEL
A kitchen that feels like you.
And works for the way you live.
Free 30-minute in-home consultation
The cabinet color is one decision. The layout, appliance requirements, installation work, and everyday routines are the foundation of a useful kitchen scope.
Tell us what you have in mind. We’ll talk through the next step.
FIND YOUR FINISH
Explore 26 cabinet finishes, from classic Shaker doors to slim profiles and clean flat panels. Select a finish to see the sample and available room photos, then plan your kitchen with Oleg & Sons.
26 cabinet finishes · Select a finish to explore.
Slim Shaker
Slim Shaker
Slim Shaker
Shaker
Shaker
Shaker
Shaker
Flat Panel
Slim Shaker
Flat Panel
Flat Panel
Shaker
Flat Panel
Slim Shaker
Flat Panel
Flat Panel
Flat Panel
Flat Panel
Flat Panel
Shaker
Flat Panel
Shaker
Flat Panel
Shaker
Flat Panel
Flat Panel
Try another cabinet name or choose All styles.
Your cabinet choice should work with your layout, storage and finishes. We’ll help confirm sizes, availability and the selections for your project.
Room photos illustrate the cabinet finish. Lighting and screens can affect color. Review a physical sample before ordering.
CHOOSE YOUR SURFACE
Find the surface that feels right with your cabinets. Explore 56 countertop finishes, then open a sample for a closer look at its color, pattern and available slab views.
56 countertop finishes · Swipe or use the arrows.
No matching finishes. Try another name or clear your search.
One row. Plenty of possibilities.
Open a sample to see the full surface.
Color and veining can vary by slab, lighting and screen. Review a physical sample and confirm the selected surface, dimensions, edge details and availability with our team before ordering.
Plan my countertops ↗A REAL PROJECT. USEFUL IDEAS.
Plan your Mukilteo kitchen with the adjoining room in view. Our local project brings white cabinetry, a wood-detailed island and a dark dining wall into a connected kitchen and dining space.

Mukilteo, WA
The completed Mukilteo kitchen pairs white cabinetry and light countertops with a wood-paneled island and concealed accent lighting. A wood beam and post carry that warmth upward. The adjoining dining area has a dark paneled wall and warm metal lighting, creating a different backdrop while keeping a visual connection to the kitchen.
Review the view from the dining table as carefully as the cooking side. Island fronts, cabinet ends, lighting and flooring transitions are part of what makes an open kitchen feel finished.
Explore the Mukilteo project ↗BEFORE & AFTER
Explore real kitchen transformations. Each example is labeled with its actual project city.
Swipe or use the arrows to browse. Drag a glass handle to compare.
Project photos show different stages and viewpoints.
A CLOSER LOOK AT OUR WORK
Watch our home remodeling tour for a closer look at the spaces and finishes.
Bellevue Home Remodeling Tour · 1:26
Watch on YouTube ↗DEFINE THE WORK
Cabinet arrangement, drawers, pantry space and appliance fit, based on the measured room.
Counters, backsplash, flooring, hardware and lighting selected as a connected palette.
The agreed demolition, trade work, cabinet installation and finish details, with responsibilities set out in writing.
DESIGN & MATERIAL SELECTIONS
We help connect layout, storage, surfaces and lighting. Explore these design concepts to discuss the look, maintenance needs and investment that suit your home.

Review cabinet sizes, drawer and pantry needs, door profiles, finish samples and hardware before orders are finalized.

Compare countertop and tile samples together. Discuss the material, edge, seams, backsplash layout and care requirements in your selections.

Coordinate pulls, faucets, pendants and task lighting with cabinet and appliance locations. Review the small transitions as part of the larger design.
Confirm who prepares the layout, selection schedule and any drawings, 3D views, architectural or structural documents your project needs. Design deliverables, professional fees, ordering responsibilities and allowances belong in the written scope.
Explore our design approach ↗DECISIONS BEFORE THE ORDERS
The working side needs storage and appliance access; the seating side needs a comfortable place for legs and stools. Confirm the counter support and the finished panel details together.
If you want concealed island lighting, decide how it is powered, controlled and reached for service. Leave those decisions in the scope before the panels and counters are installed.
Review how the new kitchen meets the dining wall, wood posts, flooring and existing trim. Identify which nearby surfaces need patching or finishing when the old kitchen comes out.


GOOD PEOPLE. THOUGHTFUL REMODELING.
Owner operated since 2013. Work with Oleg and the team to connect your selections, written scope and construction plan.
COMPARE THE COMPLETE SCOPE
Include the visible island panels, counter overhang, electrical work and adjacent finish repairs in the comparison. A cabinet-and-counter allowance alone does not describe the complete kitchen-to-dining transition.
GENERAL PLANNING RANGE
$20,000–$50,000Our broad kitchen remodeling guide. Your layout, selections and existing conditions determine the proposal.
HIGH-END RENOVATION
$75,000+Custom cabinetry, premium appliances, luxury finishes and a more involved scope can increase the investment.
Planning estimates, not fixed packages. Confirm cabinetry, counters, appliances, trade work, design, permits, disposal and tax, including exclusions and items you supply. Read the cost answer ↓
PLAN THE DOWNTIME
Agree on when the adjacent dining space can stay in use and when access is needed for installation. Coordinate counters, lighting and final panels so finishing work follows the right order.
Our general start-to-finish planning range is 6–12 weeks. Design, permits, material lead times and structural work can extend it. Confirm ordering, on-site work and periods without a usable sink or cooking equipment separately for your project.
LOCAL PLANNING
Mukilteo directs applications, checklists and inspection requests through its Building & Permits resources and online portal. Review the proposed kitchen work with the permit authority and put any required inspection stages into the construction sequence. Confirm requirements for the property before work begins.
FROM FIRST IDEA TO FINAL DETAIL
We plan the work with you, then coordinate the people and details needed to bring it together.
Share your ideas, what isn’t working, your priorities, and the home we’ll be working in.
Review the layout, materials, and design details. Coordinate specialists and permits where needed.
Agree on the written scope, selections, pricing, and project-specific schedule before construction.
Our team coordinates trades and construction, keeping you informed as the kitchen takes shape.
Review the finished work and final details together, with our 2-Year Workmanship Warranty beyond completion.

DURING CONSTRUCTION
Agree on access, surface protection, dust separation, pets and children, material storage and daily cleanup. Discuss a temporary food-preparation area and how the team will communicate changes.
Read homeowners’ feedback on Google Maps.
QUESTIONS ABOUT YOUR PLAN
Discuss the work boundary, access route and periods of utility interruption before construction. Whether the dining area can remain in use depends on the layout and scope. The plan should identify safe separation, protection and the space needed for deliveries.
Choose the panel design, lighting position, power supply, controls and maintenance access before fabrication. Review the effect with the countertop and pendant lighting. Our Mukilteo project shows one finished combination of these elements.
Include the visible island panels, counter overhang, electrical work and adjacent finish repairs in the comparison. A cabinet-and-counter allowance alone does not describe the complete kitchen-to-dining transition. Our broad guide is $20,000–$50,000, with high-end renovations at $75,000 or more. These are planning estimates; your written scope and selections determine the price.
Agree on when the adjacent dining space can stay in use and when access is needed for installation. Coordinate counters, lighting and final panels so finishing work follows the right order. A general planning range is 6–12 weeks, with design, permits, lead times and more involved work potentially extending it.
Mukilteo directs applications, checklists and inspection requests through its Building & Permits resources and online portal. Review the proposed kitchen work with the permit authority and put any required inspection stages into the construction sequence. Confirm requirements for the property before work begins.
Book a free, 30-minute in-home consultation to discuss the room, priorities and proposed scope. The team reviews next steps and the details needed for your project. Completed work is backed by our 2-Year Workmanship Warranty under its terms.
MUKILTEO & SURROUNDING COMMUNITIES
Based in Bellevue, Oleg & Sons serves homeowners in Mukilteo and nearby communities. Explore our kitchen remodeling service areas.
YOUR KITCHEN CONSULTATION
A free, 30-minute in-home visit to look at your kitchen and discuss what you want to change.
Choose a time in our calendar, share your address and project details, then meet us at your home. Prefer to start by phone? Call and tell us about your kitchen.
Oleg & Sons Bellevue Home Remodeling
Owner operated since 2013 · 2-Year Workmanship Warranty
Find us on
PinterestTikTokLinkedInYelpHouzz